top of page
Case Studies
POSCO (S. Korea)



Heat exchanger
Comparison of cross sections of the same pipe

Before IOREX installation
After 40 days
-
Removal of Calcium / Scale
-
Clearly visible lead-in & discharge section
Endoscopy of piping system

Before IOREX installation
After 4 months
-
Improved condition of corroded pipe
-
Improved condition of connecting pipe
bottom of page