top of page
Case Studies

KORAIL Daejeon (S. Korea)

Boiler (Power Plant)

Scale removal effect

Boiler in the power plant before IOREX

 

  • Nothing is coated on the globes because scale is fixed on the pipe wall. (inside Low drum)

Boiler in the power plant with IOREX

 

  • Melted scale is coated on the globes. (inside Low drum)

Fuel consumption

  • With IOREX installation,

       annual fuel consumption rate reduced by 9.59%.

* Savings/reduction rate compared to the previous year, before IOREX installation.

bottom of page