top of page
Case Studies

KIA Motors (S. Korea)

Air Conditioner (Painting Field)

Scale removal comparison

Before IOREX installation

  • Confirmation window with full of scale

  • Only 10% of nozzles are spraying as nozzles are blocked by scale.​

After 6 months

  • Confirmation window with little scale

  • 100% of nozzles are working perfectly as all scale on nozzles is eliminated.

bottom of page