top of page
Case Studies
Daegue Waterworks Headquaters (S. Korea)


Water supply pipeline
Water quality inspection


-
With IOREX installation, all reading shows below the standard limit.
-
Zero bacteria reading after 6 months of IOREX installation.
Endoscopy of piping system

Before IOREX installation
After 2 months

Before IOREX installation
After 12 months
-
After IOREX installation, scale was reduced. Also, as slime was eliminated, the material of water pipe can be visually realized.