top of page
Case Studies

Daegue Waterworks Headquaters (S. Korea)

Water supply pipeline

Water quality inspection

  • With IOREX installation, all reading shows below the standard limit. 

  • Zero bacteria reading after 6 months of IOREX installation.

Endoscopy of piping system

Before IOREX installation

After 2 months

Before IOREX installation

After 12 months

  • After IOREX installation, scale was reduced. Also, as slime was eliminated, the material of water pipe can be visually realized.

bottom of page