top of page
Total Pipe Solution
to Rust, Scale, Slime and Bio-film
in Water Pipes & Equipments
HOME
IOREX
What is IOREX?
How It Works
IOREX Effects
IOREX Features
Uses
Savings
Installation / Specification
IOREX at WORK
Water Supply
Industrial
Buildings
Hotels
Cooling Towers
Closed Loop
Farming
CASE STUDIES
IOREX Case Studies
Installation Cases
Patents & Certificates
ABOUT
Company
FAQ
Contact us
More
Use tab to navigate through the menu items.
Case Studies
Buildings (Commercial/Residential/Institutional)
Kyobo Life Insurance Training Institute (S. Korea)
Hot Water Pipe (Machinery Room)
Copper pipe – Endoscopy of piping system
Before
After 2 months
After 5 months
Most of scale was eliminated 5 months after IOREX installation.
Back to Case Studies
bottom of page